Construction of Dock Concrete Gravity armed and Filling Stone and Stone Shelter Works and concrete blocks (Core-Lock) and Complementary Works.
Construction of 2 spigots and dredging of the access channel. Reinforced concrete dock on poles of large diameter 180 m length for fishing boats.
Expansion of overseas dock, fishing dock and docking site.
Construction of Ports and Access Flooring.
Extension and construction of the port with stones spike, concrete walls and complementary works. It includes expansion of the dock for input and output of Buquebus.
Refurbishment of the metal dock and existing wood and construction of a new dock viaduct to 40,000 ton cruise.
Construction of the shelter work with exterior armored Acropódios, cabotage dock and Ultramar and Dredging of Anchorage. Provision and placement of defenses and bolardes. Additional Facilities: Drinking water, fire, lighting and motive power.
Construction of a pier with double the mooring of 30 x 160 m2 sup. located at a depth of 11-23 m s / tide, 150 meters from the coast, complete with mooring 2 beds, consisting of 135 piles of 1 m diameter and 35 m long, with reinforced concrete superstructure.
Construction of two mouths to general and mineral goods approx. 130 per 55 m2 and 215 m2 for 35 respectively ubicados on a draft of 10-15 m from 1,150 m from the coast.