Construction of 2 spigots and dredging of the access channel. reinforced concrete docks on poles of large diameter, 180 m in length for fishing boats.
Dredging of the access channel to the port 1,700 km / 2,000.
Dredging and maintenance of the navigation channel Martín García km 37 of the Access Channel at km 0 Uruguay River. Installation System Beaconing 110 km navigation channel.
Under construction site with outdoor harness Acropódios, dock Cabotage and Ultramar and Dredging of Anchorage. Provision and placement of defenses and bolardes. Complementary facilities: Potable Water, fire, lighting and motive power.
Material extraction (8.5 million m3) of Ing channel. E. Mitre, with the object of enabling the restoration of operating conditions it.
Dredging of the main channel. Estimated volume of 4,600,000 m3 dredge within 24 months.
Dredging and deepening of berths, supply and placement of bitas tie, beacons and termination details for his habilitation.
Dredging deepening and maintenance of the sites of docks 3 to 10.
A) Deepening Channel access Posta flammable.
B) Deepening the docking area 40" to zero.
Deepening of channels to the coast of 30 in Mar del Plata and 35 in Quequén, downgrading banks with draft 4m exposed to disruptive.