Building dock and transfer galleries.
Construction of civil works at the dock.
Execution of foundations, civil works and boarding gallery to the port terminal.
Reconstruction of quays and ancillary works.
Engineering, construction, assembly and start. Refraction dock President Illia.
Construction of civil works of the dock.
Foundation board 3 towers with poles and large diameter precast heads.
Construction of the dock for containers.
New building dock for boats containers on the Dock Sud canal.
Construction of a grain shipping terminal on the Parana River. Pre metal transfer gallery 95 m long. Transfer galleries and barges metal frame on towers and heads and reinforced concrete poles - length of galleries 233 m - 3 dicks reinforced concrete 40 m long c / u. 4 Dukes D'Alba and 2 towers of reinforced concrete tie, yes distance between 290 m.
Construction of a covered gallery transfer in prestressed concrete 200 m long and 4.50 m wide.