Construction of the dock for containers.
Construction of the dock and transfer galleries.
Execution of foundations, civil works and boarding gallery for port terminal.
Reconstruction of the dock and complementary works.
Construction of civil works, dock.
Foundation board 3 towers with poles and large diameter precast heads.
Construction of a grain shipping terminal on the Parana River. Metallic pre-transfer gallery 95 m long. Transfer galleries and barges metal frame on towers and heads and reinforced concrete poles -Length galleries 233 m 3 dicks reinforced concrete 40 m long c / u. Dukes D'Alba and 2 towers of reinforced concrete tie with a distance between them of 290 m.
Construction of a covered transfer gallery with prestressed concrete 200 m long and 4.50 m wide and 3.50 high.
Construction of a covered gallery transfer in prestressed concrete 200 m long and 4.50 m wide and 3.50 m high.